Technology & AI
World’s first enhanced geothermal power plant completed in just 23 months
Source: TechCrunch · Published
Fervo Energy completed its first power plant in less than two years. The next phases promise to connect to the grid even quicker.
Fervo Energy completed its first power plant in less than two years. The next phases promise to connect to the grid even quicker.
Related stories

First dinosaur bone from Antarctica found in a drawer
The fossil, collected in Antarctica in 1985, is part of the tail of a beast called a Titanosaur.
feeds.bbci.co.uk ·

Samsung launches its first clip-on earbuds in South Korea
A global rollout will follow, although we don't yet know the details.
Engadget - Technology News & Expert Reviews ·

First Glastonbury 2027 tickets sell out
Coach tickets for the 2027 festival are all snapped up in under 30 minutes.
feeds.bbci.co.uk ·

The Last First: Winter K2 review – race up second highest mountain reveals fatal cost of human ambition
Amir Bar-Lev’s doc covering competing climbers trying to achieve something that has not been done before uncovers a fascinating tapestry of aspiration and folly During the Covid pandemic in 2021, a “last first” in mountaineering was achieved: the forbidding K2 mountain was scaled
Culture | The Guardian ·
New “plant armor” more than triples strawberry yields
A new protective fabric boosted strawberry yields by as much as 3.56 times while blocking insects and still allowing sunlight, rain, and airflow to reach the plants. Originally inspired by research on military clothing, Plant Armor could also help farms reduce pesticide and water
All Top News -- ScienceDaily ·